
(ABOVE)
“St. Albans Advertiser”, July 1, 1965:
For two hundred working days, the Coal River Bridge at Main St.
will be closed. The old bridge will be taken out and a new one installed.
Traffic will be detoured to U.S. Rt. 60. Low bid was $338, 000
by Mountain State Construction.